Sampling
Study Sites - First Season
| Project Links: |
Project Home |
Media Coverage | Data |
| We
began establishing sample plots at 4 lake locations and 7 stream
locations in Wright Valley and Taylor Valley, Antarctica on January 12,
2005. Sampling commenced on January 15, 2005. A "sampling run"
includes: 1) sampling soil for biogeochemical analysis, 2)
sampling soil for microbial analysis, 3) sampling soil for soil
water stable isotope ratio determination, 4) measuring surface soil
electrical conductance, moisture content, temperature, and soil
activity, 5) deploying ion-sorbing resin strips, and 6) pushing a
T-bar into the ground to measure the depth to the point of refusal
(~active layer depth). Current status:
|
|
|
|||
| Gooseff Home |
Water Res. Engineering | Curriculum Vitae |
Research Links |